Monthly Archives: October 2011

The telescope column

The telescope will be located on the first floor, and needs to stand on a pillar with an independent, acoustically-isolated, foundation, shown below: The inner metal tube, which will later be filled with concrete, is put into place. With the … Continue reading

Posted in Building | Tagged , | Leave a comment

Ground clearance and foundations

Early work at ground level. The metal reinforcement is being prepared for the arrival of concrete – lots of it.

Posted in Building | Tagged , , | Leave a comment

Breaking Ground

Mr Parry, former Chair of Governors, breaks the ground for the new build. Mr Parry with Mr Hunt, Associate Headteacher.

Posted in Building | Tagged , , , | Leave a comment